# Basement Flood Cleanup Cost Estimator Toronto (CAD)

URL: https://basementfloodtoronto.ca/tools/basement-flood-cost-estimator/

Field Terminal // CAD Scope Estimator

# Basement Flood Cleanup Cost Estimator

Estimate a CAD range for extraction, cleanup and drying based on water category, affected area and drying days.

Basement Flood Cleanup Cost EstimatorCAD

Water CategoryCategory 1: clean water (pipe burst, supply line)Category 2: grey water (sump failure, washer overflow)Category 3: sewage backup (floor drain, toilet)

Affected AreaApproximate wet floor area in square feet

Expected Drying Days3 days4 days5 days

Extraction on the same visit (dispatch fee waived)

Yes

Estimated Scope Range (CAD)

$2,950 - $4,000

Extraction / Cleanup$714

Structural Drying$2,750

Dispatch Fee$0

Estimate only, based on published CAD bands. Final scope set by on-site IICRC S500 assessment. Insurance coverage subject to your policy limits and adjuster approval.

Get a Written CAD Scope

A technician confirms category and readings on site before any equipment goes down.

Need something non-urgent? 

Send a Message

[/contact/ →](/contact/)

 to our GTA coordination desk.

Call 24/7 (647) 277-6993

[tel:+16472776993 →](tel:+16472776993)

 

All Free Tools

[/tools/ →](/tools/)

Linked Protocols // Related Field Hubs

## Services Related to Basement Flood Cleanup Cost Estimator

![Two technicians running truck-mounted extraction hoses down basement stairs into standing water at night](/images/misc/two-technicians-running-truck-mounted-extraction-h.webp)

### Emergency Water Extraction

24/7 Rapid

24/7 truck-mount extraction with a 90-minute GTA dispatch window. Dispatch fee waived on same-visit extraction.

View protocol

[Emergency Water Extraction →](/emergency-water-extraction-toronto/)

![Two technicians in full PPE extracting sewage from a basement floor inside poly containment](/images/misc/two-technicians-in-full-ppe-respirators-and-tyvek-.webp)

### Sewage Backup Cleanup

Cat 3 S500

IICRC Category 3 sewage extraction, flood cuts, disinfection and air scrubbing, carried under $5M pollution liability.

View protocol

[Sewage Backup Cleanup →](/sewage-backup-cleanup-toronto/)

![Two technicians positioning axial air movers and an LGR dehumidifier along a partially demolished basement wall](/images/misc/two-technicians-positioning-axial-air-movers-and-a.webp)

### Structural Drying

IICRC ASD

IICRC ASD drying with LGR dehumidifiers and air movers, daily moisture readings and a dry-standard sign-off.

View protocol

[Structural Drying →](/structural-drying-toronto/)
